from $16,500
Kitchen & Bathroom Remodeling
The two rooms that decide what your whole house is worth

Kitchens and bathrooms are where remodels go wrong, because they are the only rooms where four trades have to hand off to each other in the right order. Miss the sequence and you get a tiler waiting on a plumber who is waiting on an inspector, and a two-week job becomes two months.
We run these projects with one crew and one schedule. Demo, rough plumbing and electrical, inspection, waterproofing, tile, cabinetry, counters, fixtures, finish. You know which week each phase happens, and you have one person to call when something changes.
Where we spend the most attention is waterproofing, because it is the part you will never see and the only part that can quietly ruin the room. Showers get a proper waterproofing membrane and a flood test before any tile goes on. That test is not optional on our jobs, and we will show you the result.
Pricing
Three ways this gets quoted
Turnkey pricing including demolition, all trades, permits where required, materials at trade cost and final cleanup. Cabinetry and stone selections drive most of the range.
Bathroom Refresh
Same layout, everything new. The best value in remodeling.
from $16,500
- Full demo of tile, vanity and fixtures
- New waterproofing and shower pan with flood test
- Floor and shower tile installed
- New vanity, toilet, fixtures and lighting
- Paint and finish carpentry included
Full Bathroom Remodel
Move the walls, move the plumbing, get the bathroom you drew.
from $28,000
- Layout changes and plumbing relocation
- Curbless or frameless glass shower builds
- Heated floors, niches and bench seating
- Custom vanity and stone countertop
- Permits and inspections handled by us
- Most requested
Kitchen Remodel
Cabinetry, stone, appliances and the layout that finally works.
from $42,000
- Demolition and disposal
- Semi-custom or custom cabinetry
- Quartz, granite or porcelain countertops
- Backsplash, undercabinet lighting, new electrical
- Appliance installation and final finish work
How it runs
Our kitchen & bath process
- 1
Design and fixed quote
We measure, talk through how you actually use the room, and produce a layout with a line-item price. Selections are locked before demo so the budget does not drift mid-project.
- 2
Demolition and rough-in
Everything out, then plumbing and electrical roughed to the new layout. This is when surprises behind walls show up, and we photograph and price anything we find before proceeding.
- 3
Waterproof, tile and install
Membrane, flood test, then tile. Cabinets go in, counters get templated and installed, fixtures and lighting are connected.
- 4
Punch list and handover
We walk the room with you and write down everything, however small. Nothing is called finished until that list is empty and you have signed it off.
“They found rot under the old shower pan on day one, photographed it, priced the repair and asked before doing anything. That is the whole reason I trusted them with the rest of the job.”
Sarah K. — Sherman Oaks
FAQ
Kitchen & Bath questions
The things people ask before they book. If yours is not here, call and ask it.
A same-layout remodel with new tile, vanity, fixtures and proper waterproofing starts around $16,500 and typically lands at $18,000–$26,000. Moving plumbing, building a curbless shower or adding frameless glass pushes it into the $28,000–$45,000 range.
Kitchens start at $42,000 for semi-custom cabinetry, quartz counters and new electrical, and run to $95,000 for full custom cabinetry, stone slabs and structural layout changes. Cabinetry alone is usually 35–40% of the total, so that is the decision that moves the number most.
Five to nine weeks depending on scope, and the long pole is almost always cabinetry lead time. We order cabinets before demo begins specifically so your kitchen is not sitting gutted waiting on a delivery truck.
For a same-layout cosmetic remodel, usually not. The moment you move plumbing or electrical, add a circuit or change a wall, you do. We handle the application and the inspections, and we do not do permit-required work without one — unpermitted bathroom work is a problem that surfaces at resale.
After the shower pan is waterproofed and before any tile goes on, we plug the drain, fill the pan with water and leave it 24 hours to prove the membrane holds. It is the only way to know the waterproofing works. Skipping it is common, and it is the reason so many five-year-old showers are rotting the subfloor underneath.
Coverage
Kitchen & Bath across Los Angeles & Orange County
Pick your city to see how the local housing stock changes what this job involves.
- Beverly Hills
- Santa Monica
- Pacific Palisades
- Malibu
- Calabasas
- Encino
- Sherman Oaks
- Studio City
- Woodland Hills
- Manhattan Beach
- Pasadena
- San Marino
- La Cañada Flintridge
- Glendale
- Burbank
- Culver City
- Irvine
- Newport Beach
- Huntington Beach
- Costa Mesa
- Anaheim
- Santa Ana
- Orange
- Tustin
- Laguna Beach
- Mission Viejo
Other things we do
Free estimate
Get a fixed price for kitchen & bath
Turnkey pricing including demolition, all trades, permits where required, materials at trade cost and final cleanup. Cabinetry and stone selections drive most of the range. Free walkthrough, written quote, no follow-up sales calls.
Calls answered 24/7
CA License #1166332 — licensed, bonded and insured
